Design-Construct Method Saves Time and Money in New School Building
Modern Schools, 3-5, Dec 72
Describes the Lottie M. Schmidt Elementary School in New Baltimore, Michigan, completed in 154 days. Designed to a price rather than priced to a design, the school was built at considerable savings over modular approaches -- and the modest price also covered furniture, electric heating/cooling, carpeting, full masonry construction, concrete slab floors, acoustical ceilings, steel roof, noncombustible materials, and 12-feet wide hallways. (Author)