NotesFAQContact Us
Collection
Advanced
Search Tips
ERIC Number: ED070202
Record Type: Non-Journal
Publication Date: 1970-Nov-16
Pages: 230
Abstractor: N/A
ISBN: N/A
ISSN: N/A
EISSN: N/A
Specifications for the First CSP Building System.
Detroit Public Schools, MI.
The specifications cover the construction of additions to four schools in the Detroit School District. The Construction Systems Program (CSP) was utilized in an attempt to (1) reduce the cost of school construction and provide improved value for the building dollar in terms of function, environment, first cost, and maintenance cost; (2) accelerate construction time; and (3) provide the occupants greater flexibility to better meet educational needs. This document is arranged according to the information for bidders; the contract requirements; and the specifications for the sub-systems of structure, atmosphere, lighting-ceiling, interior space division, and vertical skin. Addendums cover scheduling requirements, fire protection interpretations, and specification clarifications. Terms are defined; owner, contractor, and architect responsibilities are outlined; and proposal forms are supplied. (Pages II-1-8 and II-2-2 may reproduce poorly.) (Author/MLF)
Publication Type: N/A
Education Level: N/A
Audience: N/A
Language: N/A
Sponsor: Detroit Board of Education, MI.; Educational Facilities Labs., Inc., New York, NY.
Authoring Institution: Detroit Public Schools, MI.
Grant or Contract Numbers: N/A