Peer reviewed
ERIC Number: EJ416239
Record Type: Journal
Publication Date: 1990
Pages: N/A
Abstractor: N/A
ISBN: N/A
ISSN: ISSN-0031-5826
EISSN: N/A
Large-Scale Predictor Validation in Project A: Data Collection Procedures and Data Base Preparation.
Young, Winnie Y.; And Others
Personnel Psychology, v43 n2 p301-11 Sum 1990
Defines data base for Army Selection and Classification Project (Project A) as containing two major samples: concurrent validation sample and longitudinal validation sample. Describes data base resulting from concurrent sample, sampling procedure, distribution of sample sizes over jobs, total array of variables, and data collection procedures. Discusses extensive data editing procedures used to deal with missing data. (Author/NB)
Descriptors: Classification, Data Collection, Databases, Military Service, Predictive Validity, Selection
Publication Type: Journal Articles; Reports - Research
Education Level: N/A
Audience: N/A
Language: English
Sponsor: N/A
Authoring Institution: N/A
Grant or Contract Numbers: N/A