NotesFAQContact Us
Collection
Advanced
Search Tips
ERIC Number: EJ124211
Record Type: Journal
Publication Date: 1975
Pages: N/A
Abstractor: N/A
Reference Count: N/A
ISBN: N/A
ISSN: N/A
Project Management: The Design Phase
Rosser, Paul C.
Consulting Engineer, 45, 4, 49-51, Oct 75
The design stage encompasses the planning and scheduling of design development, preparation of construction documents, assistance in bidding and negotiation, and periodic visits to the site. (Author)
Publication Type: N/A
Education Level: N/A
Audience: N/A
Language: N/A
Sponsor: N/A
Authoring Institution: N/A