NotesFAQContact Us
Collection
Advanced
Search Tips
ERIC Number: ED501782
Record Type: Non-Journal
Publication Date: 2008
Pages: 4
Abstractor: As Provided
Reference Count: N/A
ISBN: N/A
ISSN: N/A
DC Voice Ready Schools Project Special Report on Facilities Readiness for School Year 2007-2008 in Conjunction with the 21st Century School Fund
21st Century School Fund
The big District of Columbia Public School (DCPS) school facilities issues right now are the proposed closing of underutilized school buildings and the effects of new grade-level reorganization and consolidations. However, this report focuses on another critical issue--the basic condition of all DCPS school buildings. This special report of the Ready Schools Project analyzes DCPS principals' assessments of the 2007 summer repair program, what was done and how it was managed, and provides some background on the importance of school facilities to teaching and learning as well as the basic condition of DCPS school facilities. Recommendations for continued improvements in our public school buildings are also included. (Contains 4 notes.) [This report was co-published by DC Voice.]
21st Century School Fund. 1816 12th Street NW, Thurgood Marshall Center, Washington, DC 20009. Tel: 202-745-3745; Fax: 202-745-1713; e-mail: info@21csf.org; Web site: http://www.21csf.org
Publication Type: Reports - Evaluative
Education Level: Elementary Secondary Education
Audience: N/A
Language: English
Sponsor: N/A
Authoring Institution: 21st Century School Fund
Identifiers - Location: District of Columbia