NotesFAQContact Us
Collection
Advanced
Search Tips
ERIC Number: ED047648
Record Type: RIE
Publication Date: 1971-Jan
Pages: 37
Abstractor: N/A
Reference Count: 0
ISBN: N/A
ISSN: N/A
The Resource Requirements Prediction Model 1 (RRPM-1): An Overview.
Gulko, Warren W.
This paper provides a brief overview of the conceptual approach used in the initial version of the WICHE Resource Requirements Prediction Model (RRPM-1). RRPM-1 is an institutional-oriented, computer-based model which simulates the cost of operating a college campus over a 3- to 10-year time frame. The model may be viewed as a management tool to assist higher education decisionmakers in understanding the long-range resource implications of planning decisions. This report presents information on (1) the role of RRPM, (2) design criteria, (3) model selection, (4) a generalized model, (5) The RRPM system and the dimensions of the RRPM-1 system, (6) computational flow, (7) projected unit costs, (8) projected degree-winner cost, (9) new construction costs, (10) the pilot test, and (11) future developments. A bibliography concludes the report. (AF)
Publication Type: N/A
Education Level: N/A
Audience: N/A
Language: N/A
Sponsor: Office of Education (DHEW), Washington, DC. Bureau of Research.
Authoring Institution: Western Interstate Commission for Higher Education, Boulder, CO.
Identifiers: Resource Requirements Prediction Model