NotesFAQContact Us
Search Tips
ERIC Number: ED032723
Record Type: RIE
Publication Date: 1967-Jun
Pages: 26
Abstractor: N/A
Reference Count: 0
Florida Schoolhouse Systems Project. First Phase Report.
Florida State Dept. of Education, Tallahassee.
A description is presented of the first phase of the Florida Schoolhouse Systems Project. Following a presentation of the background and objectives of the SSP, the development of integrated building systems is considered with regard to--(1) stimulation of research and development, (2) performance specifications and competitive bidding, and (3) roles of contractors, labor, architects and engineers. An evaluation is presented of the quality, design freedom, costs, and construction time of School Construction Systems Development schools in four states. Recommendations are made for the SSP concerning-- (1) use of existing components for single schools and for a volume buying program, (2) time schedule of the research and development program, (3) legal authority, (4) staff, and (5) financing. (FS)
Publication Type: N/A
Education Level: N/A
Audience: N/A
Language: N/A
Sponsor: Florida State Dept. of Education, Tallahassee.; Educational Facilities Labs., Inc., New York, NY.
Authoring Institution: Florida State Dept. of Education, Tallahassee.
Identifiers: N/A