NotesFAQContact Us
Collection
Advanced
Search Tips
ERIC Number: ED026040
Record Type: RIE
Publication Date: 1968-Nov-12
Pages: 17
Abstractor: N/A
Reference Count: 0
ISBN: N/A
ISSN: N/A
Recommended Financial Plan for the Construction of a Permanent Campus for San Joaquin Delta College.
Bortolazzo, Julio L.
The financial plan for the San Joaquin Delta College (California) permanent campus is presented in a table showing the gross square footage, the unit cost (including such fixed equipment as workbenches, laboratory tables, etc.), and the estimated total cost for each department. The unit costs per square foot vary from $18.00 for warehousing to $38.00 for the performing arts center. Total building construction costs are $19,779,000. Site development costs are $3,826,000, to which must be added $1,000,000 for movable equipment and furniture, $2,228,000 for assorted professional fees, and a reserve of $1,017,000. This makes a grand total of $27,850,000, of which $19,850,000 must be raised by a bond issue. The various departments planned for are: agriculture and natural resources, arts and letters, business education, campus centers, commons and student store, communications, forum building, health and physical education, health sciences, life sciences, materials resources, mathematics and engineering, physical science, social science, student personnel, technical and industrial, campus and district administration, and a warehouse and maintenance center. Attachments show the recommended bonding program, a comparison of present leasing and bond costs, the cost of continued leasing, and a comparison of 1972-73 bond and leasing costs. (HH)
Publication Type: N/A
Education Level: N/A
Audience: N/A
Language: N/A
Sponsor: N/A
Authoring Institution: San Joaquin Delta Coll., Stockton, CA.
Identifiers: California